A project of Open Pottsville

Pottsville Public WireBetaPardon our dust while we build this out — expect some changes along the way.

Official City of Pottsville, Pennsylvania happenings, made followable — by and for Pottsville residents

Unofficial mirror of pottsvillepa.gov — not affiliated with the City of Pottsville, Pennsylvania.


Document · Posted April 14, 2023

PDF

A proposal for improving crosswalks along the Schuylkill River Trail, a 2-mile downtown pedestrian route serving approximately 2,800 daily users. The document outlines the condition of existing crosswalks and costs to enhance them for better accessibility and the city's tourism economy.

Schuylkill River Trail & Downtown Tourism

Proposed Trail

  • 2 miles in town
  • 9 crosswalks
  • Average of 2,800 daily users

Existing Crosswalks

  • All in various states of condition
  • Few are ADA compliant
  • One does not exist

Tourism Opportunity

More than 30,000 tourists visit annually.

Cost Breakdown

  • Asphalt: $140 per 2 tons (8 ft × 15 ft)
  • Stencil: $310–$350 per crosswalk
  • Paint: variable cost (approximately 5 gallons)
  • Labor: variable cost

This page was organized with the help of AI, which can make mistakes. For the most accurate information, always consult the original on pottsvillepa.gov.

Original on pottsvillepa.gov →